Pre-terminated Subsea Cables Installation Methodology Publication

15.01.2015 00:00

 

 
The installation methodology of pre-terminated subsea cables is designed around the guiding principle that to the extent possible, work that is currently done offshore should be transitioned to be completed onshore.  The general methodology, key components, and then descriptions to various solution options have been sequentially outlined. The various solutions convey different levels of pre-termination, and as such, the ratio of onshore to offshore work varies accordingly. In the final section, key remaining challenges are outlined, with the specific intent to bring these areas of concern to the attention of potential future suppliers. 

 

Read more